Meridian Playground Play Area Improvements
Updated: March 24, 2026
Spring 2026
Thank you to everyone who participated in the public process. Comments and insights from the public helped the design consultant refine several site layouts and play equipment options. The planning, design and permitting process are complete.
- Here's the Preferred Concept Design
We anticipate this project will be out to bid soon and construction will start by summer 2026.
During construction the play area will be closed.
Location
Meridian Playground, 4649 Sunnyside Avenue North, 98103
Budget
Play Area: $1,100,000 in funding is provided by the Real Estate Excise Tax (REET)
Restroom Accessibility: $270,000
Schedule
Public engagement and design process: Early - Spring 2024
Design and Permitting: Early 2025 - Winter 2025
Construction: Summer - Late 2026
Project Description
This project aims to make site improvements to the play area located within the western half of the former Home of Good Shepherd property. The project also improves accessibility to the play area and restrooms.
Most components of the play area were constructed in the early 1980s, and revised in 2002, and some equipment was replaced through a Neighborhood Matching Fund project in 2011. Several elements/features within the play area, such as existing play equipment, art paving, play area ramps, custom-made v-slides, and rubber tiles need to be renovated or replaced.
Construction of both projects will be coordinated to minimize the length of closures.