Cheasty Mountain Bike/Pedestrian Trail Pilot Project
Updated: February 15, 2026
2026
The Cheasty Mountain Bike and Pedestrian Trail Pilot Project is a three-year bicycle and pedestrian loop trail system first envisioned by the community nearly a decade ago. For more details, including progress updates, timelines, and upcoming events, please visit our engagement hub please visit our engagement hub:
Documents
Year 3 Monitoring Reports
- Q1 Report - (North Loop)
- Q1 Report - (South Loop)
- Q2 Report - (North Loop)
- Q2 Report - (South Loop)
- Q3 Report - (South Loop)
Monitoring Period Reports
Year 1 Monitoring Reports
Year 2 Monitoring Reports
May 2023
North Loop SEPA DNS
April 2023
North Loop SEPA Checklist and Attachments
- SEPA Environmental Checklist Document
- North Loop Trail Design
- GeoTech Report
- Critical Areas Study And Conceptual Mitigation Plan
- Inadvertent Discovery Plan
- Upper Luther Burbank Park Bike Skills Area Assessment
2022
2018
- Cheasty Bike Trail Pilot - Project Update Info Sheet
- SEPA Determination of Non-Significance (DNS)
- SEPA Checklist
- Cheasty Critical Areas Study and Conceptual Mitigation Plan
- Cheasty Critical Areas Study and Conceptual Mitigation Plan, Appendix
- Geotechnical Engineering Report 1
- Geotechnical Engineering Report 2, Appendix
- Cheasty Trails Map - Technical rendering
- Cheasty Bike Trail Arborist Report
2017
- Wetland Delineation and Trail Design - Aerial View of Wetlands
- Geo Hazards - Aerial view of geologic hazard areas
2016
- Project Area Vicinity Map
- Inadvertent Discovery Plan - Trail Pilot Project
- Hearing Examiner's decision
2015
2014
Zipped Files
- Community Communications Documents (ZIP File)
(File includes but is not limited to: 2014 FAQ sheet, Bicycle Use Policy, 2014-2015 Outreach, 2014 Cheasty Project Advisory Team notes) - SEPA Documents (ZIP File)
(File includes but is not limited to: 2015 analysis and decision of SPR, 2015 Determination of Non-Significance, 2014 schematic design, SEPA checklist) - Environmental Documents
(Jan 2014) Draft consultant agreement - (Nov 2014) Draft scope proposal - (Jan 2015) Wetland Reconnaissance and Wildlife Habitat Assessment - Environmental Documents
(Nov 2013) Inventory snapshot, Monitoring criteria and evaluation checklist, 2013 Wildlife Survey - Maps/Drawings/Charts
(Nov 2014) Preliminary schematics designs, slope map, GSP management zones and forest values, design process - Technical Reports
(March 2015) Cheasty Schematic Design at Mountainview - Technical Reports - January 2014 (Geotechnical engineering investigation), November 2014 (Preliminary Geotechnical Evaluation, Wetland Reconnaissance and Wildlife Habitat Assessment)
- Board of Park Commissioners Agendas and Minutes related to this project - October, November 2013, January 2014 & April 2015
- Project Advisory Team and Community Outreach documents - 2014-2015